diff --git a/phase-ends/CURRENT_PHASE.md b/phase-ends/CURRENT_PHASE.md index 10ee2cb..d5afdb4 100644 --- a/phase-ends/CURRENT_PHASE.md +++ b/phase-ends/CURRENT_PHASE.md @@ -747,3 +747,23 @@ makes the team structure work. stopped); protecting the merge/gate/ledger role. Ledger + documented merge flow are the replacement-coordinator handover. - Registry: 401 / 392 — 8 short of the 400-body milestone. All gates green. + +## 🌟 CYCLE 4 MILESTONE MET — 400 distinct bodies + +| Cycle | New bodies | Total bodies | New regions | Total regions | Result | +|---|---|---|---|---|---| +| c4 CLOSE | +102 | **400** | +102 | **409** | **MILESTONE MET**, gate MATCH | + +- **400 distinct bodies reached** (409 regions) on the coordinator's own + whole-binary gate — the plan's P9-T6 checkpoint (≥251 new / 400 total) + is met. SHA-1 e173426c157384ebf1b6caf8c6fea18a85a14af9 stable. +- Worker B's milestone-close run: 11 consecutive first-attempt family + closes (family-as-a-set lever, stable positions + per-row re-reads), + 47 new bodies in cycle 4, then rotated cleanly with the record handoff + (60 claims gated, 104 report entries, 5 cookbook corrections, 3 + encoding-trap synthesis). +- All plans' staged milestones now met: P9-T2 (180) ✓, P9-T3 (230) ✓, + P9-T4 (290) ✓, P9-T6 (400) ✓. Remaining: P9-T7 headroom (500 target), + P9-T8 phase-close docs. +- Next: coordinator-facing phase-close — cookbook/conventions/verification + records, negatives index extraction, clean gate review.