Drew T 14b115d8ba docs(phase-30 S45 II.3): metrics re-baseline + roadmap contract delta + decision-log (R31)
- roadmap §1.1: 183 onboarded binaries; the 100% claim's exclusion list = the 34-row
  parked-for-L3 ledger (28 script + SC02/9 + MAIN/7/9 + SC03/53/54/56 — 3 rows S44 never
  tiered); supersedes the '39 type-1 backlog' framing (43 of them now build byte-identical)
- disc-completeness.md S45 section: what landed, the full parked list, the L3 resolution path
- decision-log: the S45 entry — five instrument findings a 'mechanical' batch surfaced, each
  negative-control-proven; honest baseline 94.0% instr / 95.96% fn / 87.6% distinct over 183
2026-08-06 13:36:34 -06:00
Drew T de7b347f6f feat(phase-30): T0c — the family_hseq/progress 'gap' was a cross-date+scope misread; digests now self-stamp (scope+HEAD+oracle)
Same-tree regen: family_hseq(overlays) 27,248 == progress 28,296-1,034(main)-14(resident) EXACT.
The 07-29 map was SESSION-25's open snapshot; 29,961-27,248 = 2,713 = the session's banked total.
Zero definitional gap — both tools already derive from corpus.stubs (Phase 26-A). family-hseq.md
header now stamps 'OVERLAYS only' + generation HEAD + compare-at-same-HEAD. Roadmap D-bucket
corrected. Fresh readings: 478 substantial fam / 678,404 templ ins / 28 zero-crack (S25 ate 33).
2026-07-30 16:35:59 -06:00
Drew T 8c73950270 docs(phase-29): roadmap-to-100 v2 — the owed re-baseline; P30-P33 rechartered on 2026-07-30 measured reality
- §1 contract numbers corrected: 140 onboarded + 39 type-1 pending; metrics contract marked
  IMPLEMENTED (main in denominators since 07-22); main second-oracle gap named as P31 item
- §2 rebuilt: 87.5/78.0/92.00 baseline; buckets W1-W5/M/R/T/B/D with dated sources; the
  measured lever order (recover -> fix -O0 instrument -> concentration head -> scope -> flag-plants)
- §3 rechartered: P30 Recovery & Concentration -> P31 Scope-Complete + Main & Resident ->
  P32 Behemoths+Walls -> P33 Verify+Flip; honest scale estimates from measured velocity
- §4 tooling: member_adapt + family-adapt fine-tune VACATED (dissolved premise); burn-down
  DERIVED not built (R33); new T0 defect fixes named; diff_regions BUILT
- §7 records the v1->v2 supersession (v1 in git history at commit:1210)
2026-07-30 16:06:08 -06:00
Drew T 6344a2c424 docs(roadmap): adopt the Road-to-100 endgame roadmap (Phase 27+) — supersedes the family-endgame megaplan
- docs/roadmap-to-100.md: the adopted P27-P32 roadmap to game-code TRUE 100% + public flip +
  Gen2 exit. Contract (Drew 2026-07-15): true 100% (walls re-attacked until they fall), PsyQ
  LINKED = complete (libs-from-source = far-future note), flip AT 100% (standing per-phase
  velocity checkpoint keeps the timing falsifiable), Fable5 window ~7/19 (P27 discovery
  sprint runs FIRST). Measured baseline from committed post-audit artifacts only; residue
  buckets B1-B12 incl. the never-probed 0x8017BEBC IMM family (~106k ins) and the
  main/resident second-oracle gap; foreseen-tooling table (member_adapt, gate farm, fleet
  Ghidra-C prefetch, diff_regions, cc1_probe, assert-partition); authority rules (docs-layer
  advisory; every PhaseEnd carries a 'Roadmap delta' line; constitution + latest PhaseEnd win)
- docs/decision-log.md (R31): the adoption entry — Drew's four contract decisions, the
  flip-timing tension + checkpoint, the 16-defect red-team pass that purged numbers carried
  past their invalidation events (R14 at planning scale)
- docs/family-endgame-megaplan.md: SUPERSEDED banner (content preserved; h_seq reframe
  survives, the templating thesis is byte-proven spent per PhaseEnd_Phase26)
- memory: roadmap-to-100 pointer added; structural-family-mechanical-remap corrected with the
  Phase-26 probe results (outside the repo tree)
- Phase 27 NOT started (fresh session, plan mode, per the constitution)