Commit Graph

1 Commits

Author SHA1 Message Date
Drew T ddf9266ab0 feat(phase-21): close — automation manager built + run + ceiling byte-proven; fleet 58.82%->63.18% (v1.20.0)
- THE AUTOMATION MANAGER (built + validated + run): worker_wave (parallel xHigh drafters) + grinder
  (token-free permuter daemon) + orchestrator (ROI pool rotation) + gate_stage (whole-binary byte-gate,
  sole arbiter) + backlog ledger + idiom_loop/distill flywheel. Drove fleet 58.82% -> 63.18% across ~10
  sessions, 136/136 byte-identical, 0 NON_MATCHING.
- THE CEILING, BYTE-PROVEN: cheap close=0 recovery exhausted; giant auto-waves 0/6 (x2 — giants don't
  auto-bank, they're hand-finish/permuter fuel); the cached reach-134 automated harvest COMPLETE at 63.17%.
- COLLABORATION SWEEP (5 scouts, clean verdicts): we're SOTA (no neural/GPU/diffusion shortcut); 4
  gcc-2.7.2-psx twins (VS=CC0, the clean pool partner); no Square symbols; dedup probe CLEAN NEGATIVE
  (BFM shares only PsyQ with sisters, AKAO refuted, 0 engine code) -> NO external shortcut to the gcc wall.
  +62 PsyQ names banked (byte-safe).
- TOOLKIT MATURED: cookbook §18 (-O0 split) / §19 (wave recovery + propagation cap) / §20 (cast tool +
  DEF-side wall) / §25 (coalescing + gate two-stage + h_exact over-count) / §26 (recovery exhausted) /
  §27 (giant recipe). Novel byproduct: xsig cross-project dedup tool (open-source TODO logged).
- DELIVERABLE for Phase 22: the ranked hand-finish backlog (docs/backlog.md) + the giants (×134).
- worklog -> phase-ends/logs/Phase21.md (R19); bumps project version 1.19.0 -> 1.20.0
2026-06-26 01:34:09 -06:00