Commit Graph

2 Commits

Author SHA1 Message Date
Drew T 39d5249917 chore(phase-33.5): OPEN — gate 1 (Drew, 2026-09-07, plan mode, Max): docs consolidation + the wiki as source of truth + the tracked-.run/ prune + the day-one decomp kit (v1.32.0 -> v1.32.1)
- R74–R83 ratified at gate 1 (the PhaseEnd_Phase33 candidates (a)–(j)), full text in DIGEST §3; DIGEST §0 notes the open sub-phase
- phase-ends/CURRENT_PHASE.md: milestone, effort map, the nine owner decisions, 16 tasks, the three audit ledgers (docs/ per-file
  classification; tracked .run/ groups incl. the 172 tracked-but-ignored and the two fable_cd4 disassembly listings; the memory-store
  classes), the 🛑 checkpoint, and the approved plan verbatim
- docs/phase34-seed.md: candidates (a)–(j) now R74–R83; Phase 33.5 runs before Phase 34 and touches no flip step
- harness task list built (16 rows, R28)
2026-09-07 17:06:45 -06:00
Drew T b46358f279 docs(phase-33): the Gen3 charter docs/gen3-standards.md (accuracy met + stricter than the field; sotn STYLE.md adopted + four rules of ours; the use-of-AI conduct; the measured gap; a definition of done), README 'Standards, and how the AI was used', docs/phase34-seed.md (RE-CHARTER, Drew 2026-09-07: P33 closes now at v1.32.0; the flip-gated remainder = Phase 34 = the flip + Gen2 exit at v2.0.0; Gen3 = Phase 35+); doc_links + SETUP rows; checkpoint §0a + header; log 2026-09-07 14:46:53 -06:00