- R74–R83 ratified at gate 1 (the PhaseEnd_Phase33 candidates (a)–(j)), full text in DIGEST §3; DIGEST §0 notes the open sub-phase
- phase-ends/CURRENT_PHASE.md: milestone, effort map, the nine owner decisions, 16 tasks, the three audit ledgers (docs/ per-file
classification; tracked .run/ groups incl. the 172 tracked-but-ignored and the two fable_cd4 disassembly listings; the memory-store
classes), the 🛑 checkpoint, and the approved plan verbatim
- docs/phase34-seed.md: candidates (a)–(j) now R74–R83; Phase 33.5 runs before Phase 34 and touches no flip step
- harness task list built (16 rows, R28)