Files
BFM-decomp/docs
Drew T 39d5249917 chore(phase-33.5): OPEN — gate 1 (Drew, 2026-09-07, plan mode, Max): docs consolidation + the wiki as source of truth + the tracked-.run/ prune + the day-one decomp kit (v1.32.0 -> v1.32.1)
- R74–R83 ratified at gate 1 (the PhaseEnd_Phase33 candidates (a)–(j)), full text in DIGEST §3; DIGEST §0 notes the open sub-phase
- phase-ends/CURRENT_PHASE.md: milestone, effort map, the nine owner decisions, 16 tasks, the three audit ledgers (docs/ per-file
  classification; tracked .run/ groups incl. the 172 tracked-but-ignored and the two fable_cd4 disassembly listings; the memory-store
  classes), the 🛑 checkpoint, and the approved plan verbatim
- docs/phase34-seed.md: candidates (a)–(j) now R74–R83; Phase 33.5 runs before Phase 34 and touches no flip step
- harness task list built (16 rows, R28)
2026-09-07 17:06:45 -06:00
..