Files
BFM-decomp/docs
Drew T 151da542ab docs(phase-18): cookbook §17a (toolkit at wave scale + pipeline-integration recovery) + CURRENT_PHASE Step-1 done
- §17a: measured wave close-rates (calibration 56%, Step-1 90% match_one); the match_one->gate gap
  is declaration plumbing (call-site casts not redeclaration + re-validate; stale sibling M2C_UNK decl
  reconcile; implicit-int caller class); two NEW residual classes (per-file -O0 + gcc loop-guard order)
- CURRENT_PHASE: Step 1 done, session arc 55.58->56.64%, Phase-19 deferrals listed
2026-06-20 14:41:46 -06:00
..