After the tests finish, it is valuable to report and summarize with existing test log. This avoid rerun or run the tests again when not necessary. Reviewed-by: Thomas Weißschuh <linux@weissschuh.net> Signed-off-by: Zhangjin Wu <falcon@tinylab.org> Signed-off-by: Willy Tarreau <w@1wt.eu>