Files
BFM-decomp/docs
Drew T 5ef2d4d2ab docs(phase-25): T4 CLOSEOUT — v4 retrain FAILED (negative), keep v3; T5 handoff
- A/B gate-true: v4 <= v3 (marginally worse on medium, tie easy/hard) -> discard v4, keep v3 (frozen ceiling)
- 'corpus quality > size' confirmed; 7B is capacity-bound (0/5 even on trained fns, not truncation)
- decision-log (R31): the local-7B tier is off the endgame critical path; engine = frontier-crack -> deterministic-propagate -> byte-gate + permuter
- gen2-mips-matching-model: the A/B + the maxlen-2048 truncation flaw (drop-over-length OR grad-checkpointing, NOT CPU offload) for any future retrain
- CURRENT_PHASE: T4 done/failed; NEXT = T5 (Ultracode measure-wave); phase OPEN, no PhaseEnd
2026-07-08 18:36:50 -06:00
..