phase9: ledger — B's encoding-trap synthesis, phase status at ~87% ctx
This commit is contained in:
@@ -767,3 +767,24 @@ makes the team structure work.
|
||||
P9-T8 phase-close docs.
|
||||
- Next: coordinator-facing phase-close — cookbook/conventions/verification
|
||||
records, negatives index extraction, clean gate review.
|
||||
|
||||
## Cycle 4 closure — B's final synthesis (the three traps are one class)
|
||||
|
||||
- The encoding traps (`lui` high halves, name-keyed gp markers,
|
||||
literal-vs-symbol addresses) are ONE class with ONE detection habit:
|
||||
when the instruction COUNT is already right and the residual is 1-8
|
||||
bytes, compare the ENCODING not the mnemonic — the mnemonic is
|
||||
identical in every case, only the operand encoding differs. To be
|
||||
placed ABOVE the three cookbook entries in P9-T8.
|
||||
|
||||
## Phase 9 status at coordinator review (context ~87%)
|
||||
|
||||
- **400 distinct bodies / 409 regions** — P9-T6 checkpoint met on the
|
||||
coordinator's gate. All gates green; SHA-1 stable; queue reconciled
|
||||
(excluded_recorded_negative=115); workers rotated cleanly (A, B, C).
|
||||
- Remaining plan tasks: P9-T7 (500-body headroom), P9-T8 (cookbook /
|
||||
conventions / verification records / negatives index extraction /
|
||||
README / milestone confirmation request).
|
||||
- Coordinator context near the practical wall; the ledger + documented
|
||||
merge flow are complete for a replacement coordinator if the close
|
||||
documentation exceeds remaining budget.
|
||||
|
||||
Reference in New Issue
Block a user