phase9: ledger — cycle-4 close: 400-body milestone met

This commit is contained in:
Christopher Williams
2026-09-24 02:54:25 -04:00
parent 004531ffb7
commit 1e2929c128
+20
View File
@@ -747,3 +747,23 @@ makes the team structure work.
stopped); protecting the merge/gate/ledger role. Ledger + documented
merge flow are the replacement-coordinator handover.
- Registry: 401 / 392 — 8 short of the 400-body milestone. All gates green.
## 🌟 CYCLE 4 MILESTONE MET — 400 distinct bodies
| Cycle | New bodies | Total bodies | New regions | Total regions | Result |
|---|---|---|---|---|---|
| c4 CLOSE | +102 | **400** | +102 | **409** | **MILESTONE MET**, gate MATCH |
- **400 distinct bodies reached** (409 regions) on the coordinator's own
whole-binary gate — the plan's P9-T6 checkpoint (≥251 new / 400 total)
is met. SHA-1 e173426c157384ebf1b6caf8c6fea18a85a14af9 stable.
- Worker B's milestone-close run: 11 consecutive first-attempt family
closes (family-as-a-set lever, stable positions + per-row re-reads),
47 new bodies in cycle 4, then rotated cleanly with the record handoff
(60 claims gated, 104 report entries, 5 cookbook corrections, 3
encoding-trap synthesis).
- All plans' staged milestones now met: P9-T2 (180) ✓, P9-T3 (230) ✓,
P9-T4 (290) ✓, P9-T6 (400) ✓. Remaining: P9-T7 headroom (500 target),
P9-T8 phase-close docs.
- Next: coordinator-facing phase-close — cookbook/conventions/verification
records, negatives index extraction, clean gate review.