Files
BFM-decomp/tools
Drew T b1c58d7668 docs(phase-26a): A10 wave 1 — closeness-0 wall re-test CONFIRMED REAL (0/958 bank)
Re-gated all 958 closeness-0 open-stub backlog drafts through the FIXED gate
across 135 binaries in parallel: banked=0, near=957, failed=71. The closeness-0
backlog is genuine whole-binary near-misses, NOT tooling misses -- match_one's
isolated closeness==0 systematically overstates whole-binary bankability, and the
repaired gate recovers none. P9: a re-confirmed wall is as valuable as a dissolved
one. (The audit's tooling-walls were already banked by A3f/g/h + A9b, +2.1% instr.)

backlog.py: env-gated BACKLOG_NO_RENDER so parallel workers skip the render race
(append is atomic) -- backward-compatible parallel-safety. backlog.md refreshed
with the re-test's whole-binary-informed scores.
2026-07-14 23:54:16 -06:00
..